Infrastructure works & domestic groundworks

Gadbury Fold, Atherton, Gt Manchester

Value:

£6.5M.

Clients:

Joint Venture Bryant Homes, Morris Homes, Bett Homes.

Design Engineers:

Lees Roxburgh Ltd (Infrastructure), Wardell Armstrong (Geotechnical and Foundations)

Adopting Authority:

Wigan Borough Council and United Utilities.

Project Features:

This project involved the construction of 16,600m2 adoptable carriageway and the installation of 5600m adoptable sewers, in pipe diameters ranging from 150mm to 1500mm and also the construction of 350 No manholes from Type A – Type E at depths up to 6.00m.

The project also required the construction of 450 No domestic houses and apartments with 188 No being constructed by Bryant Homes and Bett Homes during the infrastructure construction Phase, with John Reilly Civil Engineering simultaneously carrying out all of the Groundwork’s to the same.

The project was completed on time and to the satisfaction of all interested parties.

  • Northern Office
  • Millennium House, Euxton Lane,
  • Euxton, Chorley, Lancashire, PR7 6AE, UK
  • Telephone 01257 264 441
  • Southern Office
  • Barley House
  • Duncan Road
  • Park Gate
  • Southampton
  • Hampshire, SO31 1ZT, UK
  • Telephone 02380 629 900